OSC Financing Tracker
This tracker accompanies DTS’s Office of Strategic Capital — The Pentagon’s Credit Office Signal Brief.
Amounts reflect announced financing ceilings unless otherwise stated. Conditional commitments are not disbursements. Separate government equity investments, grants, and private co-investment are excluded from OSC loan amounts.
Status definitions
Funded: Public documentation confirms receipt of loan proceeds.
Conditional: Financing remains subject to specified requirements.
Withdrawn: The borrower stopped pursuing the financing.
Unresolved: Public sources conflict or do not establish current funding status.
Borrower | Announcement | Amount | Intended use | Publicly documented status |
|---|---|---|---|---|
MP Materials | Jul–Aug 2025 | $150M | Heavy rare earth separation at Mountain Pass, California | Closed and fully funded. Separate from DoD’s $400M preferred equity investment. (www.sec.gov) |
Vulcan Elements | Nov 2025 | $620M | Domestic rare earth magnet production | Conditional commitment; closing and disbursement not verified. (www.govinfo.gov) |
ReElement Technologies | Nov 2025 | $80M | Rare earth refining | Withdrew from the conditional loan process in July 2026. Exclude from the active pipeline. (oversightdemocrats.house.gov) |
Korea Zinc / Crucible | Dec 2025 | $1.25B | Financing associated with the U.S. smelter initiative | Conflicting disclosures: OSC announced a conditional package combining federal loans and private investment; a subsequent State Department fact sheet described $1.25B as funded debt. (www.linkedin.com) |
Phoenix Tailings | Jun 2026 | $500M | Domestic rare earth separation and metallization | Conditional commitment. (phoenixtailings.com) |
Energy Fuels | Jun 2026 | $725M | White Mesa processing expansion and a planned U.S. metals-and-alloys facility | Conditional; September 2026 SEC filing still requires final agreements, diligence, and approvals. (www.sec.gov) |
Performance Drone Works | Jul 2026 | $820M | Domestic drone-component manufacturing | Conditional commitment. (www.linkedin.com) |
Sila Nanotechnologies | Aug 2026 | $1.4B | Domestic silicon-anode battery-material production | Conditional commitment. (www.war.gov) |
Sunrise Energy Metals | Aug 2026 | $400M | Scandium production in New South Wales, Australia | Conditional commitment. (www.everycrsreport.com) |
Niron Magnetics | Aug 2026 | $150M | Domestic rare earth-free magnet production | Conditional commitment. (www.war.gov) |
Wolfspeed | Oct 2026 | $1.5B | Silicon carbide and gallium nitride capabilities, including refinancing existing debt | Conditional; definitive financing documents and substantial closing and draw conditions remain. (www.sec.gov) |
PsiQuantum | Oct 2026 | $150M | Domestic advanced manufacturing and quantum-computing prototyping | Conditional commitment. (Morningstar) |
Antheia | Oct 2026 | $80M | Domestic pharmaceutical starting materials and active ingredients | Conditional commitment. (Antheia) |
Stoke Space | Oct 2026 | $150M | Expanded launch infrastructure at Cape Canaveral | Conditional commitment. (Forth) |
Neros | Nov 2026 | $450M | Expanded domestic drone production | Conditional commitment. (theoagseo.com) |
LeoLabs | Nov 2026 | $150M | Production and deployment of space-tracking radar infrastructure | Conditional commitment, with announced dollar-for-dollar private co-investment. (www.forth.news) |
6K | Nov 2026 | $250M | Cathode-material production in Jackson, Tennessee | Conditional commitment. (www.6kinc.com) |
Halo Industries | Nov 2026 | $75M | Expanded silicon carbide wafer production | Conditional commitment. (InsideDefense.com) |
Rocket Lab | Nov 2026 | $150M | Increased Neutron production and launch cadence, including recovery infrastructure | Conditional commitment. (www.publicnow.com) |